Skip to content
OZELECT
Scott from OzElect mounting a white wall EV charger in the garage of a Southern Highlands home

EV charger installation, Southern Highlands

Charging off a power point? Get a proper wall charger.

A wall charger fills your car overnight. We check your board and supply first, then fit it safely.

Local since 2008 · 750+ jobs done

  • Local since 2008
  • Licensed, Lic. 395659C
  • Guarantee on all work
“I have used OzElect for a number of small and bigger projects over the years and always found Scott and his team to be reliable and professional. …”
RobGoogle review
“Great service and always willing to fit in with when we need work done. Thanks Scott.”
KimFacebook recommendation

Sound familiar?

Your new car, stuck on slow charge

Most people start by plugging the car into a normal power point. It works, but it's slow, and many old boards were never built for it.

Illustrative: an electric car charging from a garage power point through an extension lead, beside an old fuse board

A full charge takes days

The car is still half empty when you need to go.

Leads across the floor

An extension lead snakes over the garage to the car.

Power trips at night

Car, hot water and heater all on, and the board gives up.

An old fuse board

No safety switches and no room for a new circuit.

The shed is a long way off

You want to charge where you park, not by the house.

Not sure your board can take it?

Send us a photo of the outside of your switchboard. We'll tell you straight what it needs.

Call us now

How we fix it

A wall charger that just works

We check your supply, switchboard and cable run first. Then we fit the charger on its own circuit, test it and hand you the paperwork.

What we check before we fit a charger

Fitting a charger is the easy part. What decides the job is the house, the switchboard and the supply behind them. In the Southern Highlands, those three vary a lot from one property to the next.

Most homes run on single-phase supply. Some larger homes, rural properties and commercial sites have three-phase. Which one you have sets the ceiling on how fast any charger can work, so it needs settling before you buy a charger.

The switchboard is where most home charger jobs are won or lost. A charger needs its own circuit, its own protection and enough headroom on the main switch, and many older boards can't offer all three without work.

Acreage changes the job in ways a suburban install never meets. Distance from the switchboard drives cable size, cable between buildings may need trenching or conduit, and earthing needs a look on rural properties.

In NSW, charger wiring must be done by a licensed electrician, and the electrician provides a certificate of compliance when the work is finished.

The usual wayWith OzElect
Charging off a power pointA wall charger on its own circuit
Leads across the garage floorA tidy charger right where you park
A board that can't copeRoom on the board, with the right protection
  • Faster chargingWake up to a full car most mornings.
  • Safe and certifiedLicensed work with a compliance certificate.
  • Fits your propertyHouse wall, garage, shed or carport.
  • Smart load controlAsk about chargers that ease off when the house is busy.

Not sure what you need?

Send us a photo of your board.

Call 0412 481 123 or email a photo of the outside of your switchboard and where you park. We'll tell you what the job involves.

Call 0412 481 123

Four steps, start to finish

From power point to wall charger

Here's how a home EV charger install goes.

  1. Illustrative: Scott from OzElect in his ute taking a call and noting down a customer's EV charger job

    Step 1

    Call or send photos

    Tell us your car, where you park and send a photo of the outside of your board. We book a time to come and look.

  2. Illustrative: Scott from OzElect pointing out a cable route to a detached shed with a homeowner on an acreage property

    Step 2

    We check the site

    We check your supply, your board and the best spot for the charger. Then we walk you through what the job needs and why.

  3. Illustrative: Scott from OzElect wiring a new circuit breaker for an EV charger into a modern switchboard

    Step 3

    We fit and test it

    We run a new circuit from the board, fit the right protection and mount the charger. Then we test it all before it's used.

    “Scott was fast, professional, great quality of work …”
    Daniel, google review
  4. Illustrative: Scott from OzElect smiling as a homeowner plugs her electric car into her new wall charger

    Step 4

    Plug in and drive

    You get your compliance certificate. We show you how the charger works and how to change its settings.

750+ jobs since 2008

Locals who trust us with their power

What our customers say, word for word.

“We have used Scot and his team at Ozelect for more than 7 years. Initially they were involved in the extensive renovation of our house, carrying out all the electrical work internally and externally. I can highly recommend the team at Ozelect , the work is always to a very high standard , no short cuts and always cleaning up afterwards. …”
JamesGoogle review
“Scott has been helping us with all types of electrical work on our property for many years now. Always reliable and friendly service, very happy to recommend him to anyone else.”
SimonGoogle review
“OzElect have done a lot of work for us over the years and I would highly recommend Scott and the team. Great work, clean working space and good communication.”
Suzi BryantCustomer review

Got a job for us? Call Scott and the team, Mon–Fri 7am–5pm.

Questions we get asked

EV charger questions

Can I put a three-phase EV charger on a single-phase home?

You can fit one, but it will charge at the single-phase rate. Faster three-phase charging needs the supply itself to change, which usually involves the network operator and extra works.

Will my old switchboard need replacing first?

Not always. Old fuses, no safety switches or no spare room usually mean board work comes first. A sound modern board can often take a charger circuit as it is. We check it on site.

Can I open my switchboard to check what's in it?

No. Older boards can contain asbestos, so nobody should open one without an assessment. Take photos of the outside and leave the rest to us.

Do I need council approval in NSW?

Rarely, for a standard home install. What you do need is a licensed electrician and a certificate of compliance. Strata, heritage homes and supply changes can need other approvals.

Can you fit a charger in my shed?

Yes. A shed usually needs a longer cable run, sometimes trenching or a small sub-board, and an earthing check. We look at all of that on the site visit.

Are you licensed?

Yes. OzElect is fully licensed and insured. Our NSW licence number is 395659C.

Electrician across the Southern Highlands

  • Moss Vale
  • Bowral
  • Mittagong
  • Berrima
  • Robertson
  • Bundanoon
  • Tallong
  • Burradoo
  • Exeter
  • Sutton Forest
  • Burrawang
  • Kangaloon
  • Welby
  • Braemar
  • Colo Vale
  • Hill Top
  • Yerrinbool
  • Penrose
  • Wingello
  • Marulan
  • See our service area

Get a quote

Ready to charge at home?

Send your details or call 0412 481 123. We'll check your site and tell you what the job needs.

Rather talk now?0412 481 123Mon–Fri 7:00am–5:00pm

NSW Licence No. 395659C

Scott McKie from OzElect with one of his electricians beside the work ute
You'll get a call back from our team.

Get a quote

Tell us how to reach you. We will call you back to talk it through and book a time that suits you.

Local since 2008 · 750+ jobs done

Urgent? Call 0412 481 123

What happens next

  1. 1You send your details.Name, number and email. Takes a minute.
  2. 2We call you back.During business hours, to talk the job through.
  3. 3We come to you.We look at the job and give you a clear quote before anything starts.